Recent Test Yields Pleasing Results

Last night, the lights which were up so far were turned on just before dusk to do the first full on computer control test.

Results were better than expected, although not perfect. With two different types of controllers being used this year, (Light-O-Rama CTB16PC’s and DIY Olsen 595 Switches) there appears to be a very slight delay with the former, of only a fraction of a second. This is fixable by adjusting the light patterns in the sequencer (Vixen 2.5.0.0) so that all the channels of light that use the LOR controllers send out the message a fraction before messages are sent to the Olsen 595 controllers. This, I hope, will correct the problem. Testing will continue leading up to opening night, which this year is Tuesday December 1st from 8:00 pm (lights on from 8:30 pm).

Set up over the past week has been slow due to record breaking heatwave conditions, but while there’s a break in the very hot temperatures I shall get to work setting more decorations up.